MIS 2100 Lecture 7: Section 5.1
Document Summary
Mis section 5. 1: mis infrastructures and mis assets. Includes the plans for how a firm will build, deploy, use, and share its data, processes, An exact copy of a systems information: recovery. The ability to get a system up and running in the event of a system crash or failure: fault tolerance, failover, failback, disaster recovery plan catastrophic disaster such as a fire or flood. Detailed process for recovering information or an it system in the event of a: disaster recovery cost cure. 1: charts the cost to the organization of the unavailability of information and technology. Friday, february 10, 2017: the cost to the organization of recovering from a disaster over time, hot site disaster and resume business, cold site. A separate and fully equipped facility where the company can move immediately after a. A separate facility that does not have any computer equipment, but is a place where employees can move after a disaster: warm site.