SMG OM 323 Study Guide - Midterm Guide: Remanufacturing, Job Shop, Maximum Capacity
Document Summary
Estimate sales & margins; investment and expense plan. Detailed designs- information systems, promotion, & nancial plan. *mission: what our rm does our current purpose. Culture: what we assume or believe we should or should not do. Laws: external requirements for what we must do or may not do. = . 50 target cost available for cogs (30% mfg. Development that meets the needs of the present without compromising the ability of future generations to meet their own needs . Reduce the use of non-renewable materials, energy, and water and the production of pollution and waste. Re-use and recycle materials, energy, and water where possible and economical. Reduce costs through more efficient use of resources. Cradle to-grave assessment (aka life cycle analysis) useful life. This is the assessment of the environmental impact of the product throughout its. To final disposition at the end of a product"s useful life. Remanufacturing: refurbishing used products by replacing worn-out or defective components.