ECON 431 Final: ECON 431 Cal Poly SLO Final Exam 2006

65 views8 pages
31 Jan 2019
School
Department
Course
Professor

Document Summary

A firm pollutes a local river and causes damage to a swim club downstream. Marginal benefit from polluting and the line mc represents the marginal cost of the pollution damages to swimmers. State your answers to each of the following questions in terms of the areas 1,2,3,4,5, and 6. Question 2. (40 points) two firms pump water from pismo creek: a winery (firm 1) and an avocado orchard (firm 2). Let x1 denote the water pumped by firm 1 and x2 denote the water pumped by firm 2. 2 for benefit each firm derives from pumping water are tb1 = 200x1 x1 firm 2. Neither firm faces any pumping cost to remove water from pismo creek. Pismo creek is home to an endangered species of steelhead trout and is part of california"s steelhead restoration and management plan. The external cost of pumping water from pismo creek on the local steelhead population is tsc = 20 , where.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related textbook solutions

Related Documents

Related Questions