ESET-212 Lecture 4: ESET212-BOILER CONTROLS MAINTENANCE SCHEDULE

55 views2 pages
2 Feb 2019
Department
Course

Document Summary

Maintenance, repairs, and testing should be conducted on a regular basis and recorded in a boiler logbook for future reference. Automatically fired boilers (asme csd-1) provides a checklist of maintenance, repair and testing for a basis of- Daily, weekly, monthly, semi-annual, annual, and as-required requirements. Preventive maintenance is a planned or scheduled maintenance that should be performed on a time base. It is done for prevent the boiler from accidents in general. It is done based on the condition of the equipment to protect the equipment from predicted accidents. Break-down maintenance is performed when accidents have already happened to equipment to save the equipment form further damage. who should perform those tests : the boiler operator or a service technician. Verify the operation of the low water fuel cut-off device and alarm on high pressure boilers. Verify the operation of the low water fuel cut-off device and alarm on low pressure boilers.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents