IND 400 Lecture Notes - Lecture 19: Takt Time, Forklift, Aisle
Final Exam
- Forklift, material handling could use something like travel time, palletizing etc.
- theres no only forklift question
- MOST tables will be provided if there’s a most question
- Brand efficiency+ performance rating and allowances are all based on %s make sure you
know the diff.
- Takt time is not std time
- Throughput is not to be confused with takt time costs
^not to be used in an ROI situation
- Similar to midterm formatting; takt time all that still important
- Can give a flow diagram or layout and ask you how you would improve the material handling
and methods
- How to improve aisle: racking? KPI add more rows of racking – better utilize space but might
lead to material handling issues w forlift trucks not being able to reach
- Know process of quality assurance I think this is the 2-bar code systems etc
- Shipping and receiving functionalities and quality control for incoming/receiving procedures
o EXAMPLE:
o 14 docks, 400 shipments and some are on nonslip mats and some are on pallets
o What’s the receiving/ shipping processes and how do u do quality control procedures
- Multifaceted questions integrated problems
- Work sampling
- How to get the standards from info given
- How to construct the flowcharts
- Aisle optimization
- Side note: Interlocking integrity- how strong it is as a block
- Tier height clearances
- Skimming out sides of 80’’ pallet to fit in 68’’ racks?
- Need a new method, standard data set up for new process of skimming
- Need to consider methods, routing, material handling – need new area for spot (temporary
storage) – more material movement
- Alternative: Redesign the rack – cost
find more resources at oneclass.com
find more resources at oneclass.com
Document Summary
Forklift, material handling could use something like travel time, palletizing etc. Most tables will be provided if there"s a most question. Brand efficiency+ performance rating and allowances are all based on %s make sure you know the diff. Throughput is not to be confused with takt time costs. ^not to be used in an roi situation. Similar to midterm formatting; takt time all that still important. Can give a flow diagram or layout and ask you how you would improve the material handling and methods. Kpi add more rows of racking better utilize space but might lead to material handling issues w forlift trucks not being able to reach. Know process of quality assurance i think this is the 2-bar code systems etc. How to get the standards from info given. Side note: interlocking integrity- how strong it is as a block. Need a new method, standard data set up for new process of skimming.