IND 400 Lecture Notes - Lecture 19: Takt Time, Forklift, Aisle

47 views2 pages
Final Exam
- Forklift, material handling could use something like travel time, palletizing etc.
- theres no only forklift question
- MOST tables will be provided if theres a most question
- Brand efficiency+ performance rating and allowances are all based on %s make sure you
know the diff.
- Takt time is not std time
- Throughput is not to be confused with takt time costs
^not to be used in an ROI situation
- Similar to midterm formatting; takt time all that still important
- Can give a flow diagram or layout and ask you how you would improve the material handling
and methods
- How to improve aisle: racking? KPI add more rows of racking better utilize space but might
lead to material handling issues w forlift trucks not being able to reach
- Know process of quality assurance I think this is the 2-bar code systems etc
- Shipping and receiving functionalities and quality control for incoming/receiving procedures
o EXAMPLE:
o 14 docks, 400 shipments and some are on nonslip mats and some are on pallets
o What’s the receiving/ shipping processes and how do u do quality control procedures
- Multifaceted questions integrated problems
- Work sampling
- How to get the standards from info given
- How to construct the flowcharts
- Aisle optimization
- Side note: Interlocking integrity- how strong it is as a block
- Tier height clearances
- Skimming out sides of 80’’ pallet to fit in 68’’ racks?
- Need a new method, standard data set up for new process of skimming
- Need to consider methods, routing, material handling need new area for spot (temporary
storage) more material movement
- Alternative: Redesign the rack cost
find more resources at oneclass.com
find more resources at oneclass.com
Unlock document

This preview shows half of the first page of the document.
Unlock all 2 pages and 3 million more documents.

Already have an account? Log in

Document Summary

Forklift, material handling could use something like travel time, palletizing etc. Most tables will be provided if there"s a most question. Brand efficiency+ performance rating and allowances are all based on %s make sure you know the diff. Throughput is not to be confused with takt time costs. ^not to be used in an roi situation. Similar to midterm formatting; takt time all that still important. Can give a flow diagram or layout and ask you how you would improve the material handling and methods. Kpi add more rows of racking better utilize space but might lead to material handling issues w forlift trucks not being able to reach. Know process of quality assurance i think this is the 2-bar code systems etc. How to get the standards from info given. Side note: interlocking integrity- how strong it is as a block. Need a new method, standard data set up for new process of skimming.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers