PMT 720 Lecture Notes - Lecture 11: Work Breakdown Structure, Project Charter

76 views2 pages

Document Summary

1. 1 assembling teams and groups within the project. 2. 1 select team members (contractors, designers, engineers, test athletes, etc. ) and allocate resources to different sectors. 2. 2 create financial reports to determine funds needed. 2. 3 determine deadlines for each step in the project. 2. 4 select a design and create a blueprint of the bikes and determine necessary parts for engineering and building. 3. 1 begin engineering the parts required to manufacture the bikes. 3. 2. 1 import necessary parts from other countries or factories if required. 3. 3 build the foundation structure of the bike. 3. 4 attach the necessary additions to the bikes (wheels, brakes, seats, etc. ) 3. 6 test the prototype bikes with athletes to ensure they meet the necessary requirements. 3. 7 add final design aspects to the bike (paint, etc. 4. 1 ensure that test athlete opinions and critiques are received and understood. 4. 2 ensure that all safety regulations are met and the bikes are capable of withstanding the terrains.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers