REM 500 Lecture Notes - Lecture 8: Presales, Drywall, Project Manager

70 views5 pages

Document Summary

At this stage, it is really hard to stop now; would be costly and ruin your reputation. Manage resources (people and money), supervise and coordinate. Often multiple parties conduct inspections: pm and cm, architect, engineers. #1: land is prepared (remove trees, level site, measure building footprint) #3: footings are formed and poured (concrete slabs that support foundation walls) #4: foundation walls (might be poured concrete or concrete blocks) Sills: anchored to the foundation, then joists (support grid) are attached. Wall studs: attached to sills to create frame. Metal studs are not load-bearing: they can snap! Interior: insulation, drywall, heating and cooling, painting, flooring, kitchen and bathroom, plumbing and electrical. Single family construction 4 to 7 months. Create column in the middle made of concrete; put the elevator and stairwell and janitorial services in the strong concreate frame; provides structure (central core) Many tasks can be done simultaneously (ie. floor and kitchen cabinets)

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related textbook solutions

Related Documents