Management and Organizational Studies 3330A/B Lecture Notes - Lecture 6: Makespan
Document Summary
Aggregate plan provides a framework for short-term production and capacity decisions: disaggregation: the process of breaking an aggregate plan into more detailed pans. File: explosion: disassembly of the end product into its, netting: (new requirements) = (gross components. On order) delivery lead time or produced: offsetting: order realize is offset by production or, lot sizing: determine the batch size to be purchased. States the requirements for individual end items by date and quantity. Mpr is not: a sales forecast. Mps should be: schedule: anticipated build, realistic and achievable, may not be feasible, a wish list, a final assembly schedule. A file with all the information about the product and the inventory. Bill of which go into a product. Material (bom) lists and how many items that. Top (8 x 1 x 1 x 1000) (8 inches) x (1 top clip) x (1 clip assembly) x (1000 clipboards)