ACTG 2020 Lecture Notes - Lecture 1: Stabilisation Force In Bosnia And Herzegovina

40 views4 pages
15 Sep 2016
Department
Course
Professor

Document Summary

Chap 11 flexible budgets and overhead analysis. A performance report compares actual costs with budgeted costs: compare actual costs with the budgeted costs for the budgeted level of activity, compare actual costs with the actual level of activity. The first choice^ requires a report on static budgets, the second requires a reposed based on flexible budgets. Prepared in advance based on a particular level of activity and is not adjusted or altered regardless of any subsequent changes in actual output, revenues, or costs. Fundamentally, this does not make sense because two different activity levels are being compared. A meaningful report would compare the same activity levels. A flexible budget enables a firm to compute the expected costs per unit and then estimate costs for a range of activity levels or production volumes. Two types of flexible budgets: before the fact. Gives expected outcomes for a range of activity levels or production volumes.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents

Related Questions