CEE 3611 Lecture Notes - Lecture 28: Performance Bond
Premium

Lecture - 28 o Performance and paymentbonds • If the contractor is awarded the contract, performance and payment bonds are issued. • A performance bond is issued to a contractor to guarantee the owner tha...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 30: Lecture 30
Premium

Lecture 30 o Material Improprieties A public owner must determine whether there is any material impropriety which would preclude award of a public contract. A material impropriety can be anything that is not proper in eit...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture Notes - Lecture 26: Subcontractor, Profit Margin
Premium

Lecture - 26 o Technical specifications • The contract documents must convey the requirements of the project to potential bidders and establish a legally precise picture of the technical aspects of the...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture Notes - Lecture 27: Bid Shopping
Premium

Lecture - 27 o Bid shopping • It is sometimes the custom in the construction industry where there are no protective laws, to shield a subcontractor from the unfair practice of bid shopping, for the pri...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture Notes - Lecture 29: Beedi
Premium

Lecture - 29 o Public and private sectorbidding • Bidding practices of the public and private sectors of the industry differ tremendously. The term • public in this context means that the construction work...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 31: Lecture 31
Premium

Lecture - 31 o Rejection ofbids • A public owner normally must reject bids received after the time specified in the bid documents for submitting bids. • In practice late bids are usually rejected but not ...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture Notes - Lecture 33: Liquidated Damages
Premium

Lecture - 33 • Call attention the areas of specialconcern • Answer contractorinquiries • Clarification of specification provisions Contract administration • Notice to proceed • Time of thec...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 39: Lecture 39
Premium

Lecture - 39 • MEASUREMENT AND PAYMENT o Construction progresspayments • Among the most important items to the contractor are those provisions of the contract governing the making of monthly progress payme...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 34: Lecture 34
Premium

Lecture - 34 o Starting a project • The beginning of a construction project normally starts with the award of the construction contract. • This may be accomplished in the minutes of a city council or count...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 38: Lecture 38
Premium

Lecture - 38 o Administrativeactivities • The following list serves as a summary of the principal administrative activities of the Resident Project Representative: ▪ Coordinate and provide ge...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 32: Lecture 32
Premium

Lecture - 32 • PRECONSTRUCTION OPERATIONS o The preconstructionconference • The preconstruction conference allows the key personnel of both sides to be introduced, and the responsibilities and authorities...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 36: Lecture 36
Premium

Lecture - 36 • CONSTRUCTION OPERATIONS o Authority and responsibility of allparties • Depending upon the type of contract the owner may be authorized to award other contracts in connection with the same wo...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 35: Lecture 35
Premium

Lecture - 35 • PLANNING FORCONSTRUCTION • Construction planning and scheduling should be considered as an application of common sense, a logical analysis of a construction project togethaer with all of ...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture 40: Lecture 40
Premium

Lecture - 40 o Evaluation of contractor’s payment request • At a prearranged date each month, the contractor is expected to submit a request for payment for all of the work performed during the preceding ...

Civil Engineering
CEE 3611
Dr.
CEE 3611 Lecture Notes - Lecture 46: Performance Bond
Premium

Lecture - 46 • PROJECT CLOSEOUT o Acceptance ofwork • Acceptance of the work and final payment to the contractor must proceed in accordance with the terms of the construction contract documents. • Alt...

Civil Engineering
CEE 3611
Dr.
Permachart - Marketing Reference Guide: Magnetic Circuit, Electrical Network, Angular Velocity

l e a r n • r e f e r e n c e • r e v i e w permacharts TM Electrical Engineering GLOSSARY OF TERMS ...

Electrical Engineering
4400:307
All Professors
Electricity & Magnetism - Reference Guides

This Guide is another one of the many products that effectively advances one’s knowledge of a distinct aspect of the physical sciences. The basic of the properties of electricity and electrical circuits are established in ...

Electrical Engineering
4400:307
All Professors
Permachart - Marketing Reference Guide: Semiconductor Device, Precision Rectifier, Envelope Detector

permacharts TM E le c t r o n ic sI Waveforms Diodes ...

Electrical Engineering
4400:307
All Professors
Permachart - Marketing Reference Guide: Schmitt Trigger, Square Wave, Negative Feedback

permacharts TM E le c t r o n ic sII Operational Amplifiers (OP AMPS) ...

Electrical Engineering
4400:307
All Professors

Log In


OR

Don't have an account?

Join OneClass

Access over 10 million pages of study
documents for 1.3 million courses.

Sign up

Join to view


OR

By registering, I agree to the Terms and Privacy Policies
Already have an account?
Just a few more details

So we can recommend you notes for your school.

Reset Password

Please enter below the email address you registered with and we will send you a link to reset your password.

Add your courses

Get notes from the top students in your class.


Submit