ENB272 Study Guide - Pore Water Pressure, Triaxial Shear Test, Shear Stress

126 views12 pages
9 Jul 2013
School
Department
Course
Professor

Document Summary

Unfilled height of the shear box after placing the top porous stone. Mass of the sand + pan (before use) Mass of the sand + pan (after use) The dry density may be calculated using the equation; Dry density (pd) = dry mass (m) / volume (v) Where mass is in grams, and volume is in g/cm3. The dry mass (m) is calculated below, subtracting the mass of the sand + pan (after use)" from the mass of the sand + pan (before use)"; = [( 632)/4](h) h = (height of the shear box) (thickness of the top porous stone) (unfilled height of the shear box after placing the top porous stone) h = 36. 15 6. 5 10. 98 h = 18. 67mm. Therefore the dry density (pd) can be calculated to be; The vertical load may be determined using the equation below; The vertical load is known to be 400n (refer to table 1).

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents