INDU 211 Study Guide - Midterm Guide: Gantt Chart, Peter Drucker, Walter A. Shewhart
Document Summary
Basic engineering process: problem symptom, problem definition, including statement of desired outcome, analysis, synthesis of alternate solutions (switch between 3 and, decision, solution, system of method. Motion analysis and time study = f. b. gilbert. Concerned with design, improvement and installation of integrated systems of people, material, info, equipment and energy. It draws up skills in mathematical, physical and social science together with the principles and methods of engineering analysis and design to specify, predict and evaluate the results to be obtained from such systems. Aiie/iie = the american/ institute of industrial engineers = Design system at two levels: human activity systems (physical workplace, manufacturing process, materials, machines, storage, safety procedures, forecasting procedures, budgeting. Inventory control d: management control systems (procedure for planning, measuring and controlling activities) Definition: design of the actual process to be used in the manufacture of the product. Total cost = fixed cost + variable cost/unit x # of units.