CISC 327- Final Exam Guide - Comprehensive Notes for the exam ( 55 pages long!)

63 views55 pages

Document Summary

Quality assurance achieving quality: plan, monitor, discipline. Most of the focus is below: testing running on example inputs. Implementation and unit testing design realized as a set of programs and components: verify that units meet functional specs, qc unit & components testing. Integration and system testing integrate individual programs and units into complete system validate system meets requirements: qc integration & acceptance testing, operation and maintenance i(cid:373)p(cid:396)ovi(cid:374)g syste(cid:373)"s u(cid:374)its a(cid:374)d co(cid:396)(cid:396)ecti(cid:374)g e(cid:396)(cid:396)o(cid:396)s. Inflexible partitioning (into different stages) mgmt. adv. Ibm"s etvx entry, task, validation, exit: drawbacks, wasted work must be thrown away after prototyping phase, normally built quickly so can be substandard, inadequate or incomplete prototypes, when to stop iterating. Determine objectives - specific objectives for the phase of the project: constraints on the process and product are id"d, alternatives for achieving objectives, potential risks id"d, 2. Assess and reduce risks for each potential risk, analyze: reduce risk, alternitives for minimizing the risk are chosen, 3.