COE 718 Final: COE718 - Fall 2015 Sample Final

67 views16 pages

Document Summary

The examination has 8 pages and 6 questions. To earn maximum credit, your answer must be concise, to the point and in the given space. All questions are not of the same difficulty and value. Consider this when allocating time for their solutions: draw a diagram of the triple modular redundancy (tmr) architecture. Also list any possible issues that may arise using the tmr approach. Page 1: table i presents an rms schedule for a real-time military tracking system. The system consists of 3 tasks to be scheduled, each with their corresponding computation time and period. 5 (a) determine if the military tracking device is schedulable according to the rms schedulability test. Marks: 5 (b) verify if the schedulability test in (a) was correct by calculating the response times of all three tasks in. State your findings and compare to the schedulability test.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents