TRA 3313 Study Guide - Final Guide: Proliant, Stereo Skyline, Hydro Ottawa

80 views13 pages

Document Summary

I am submitting the attached report entitled power generator purchase. The report explains and categorises nova"s requirements into two main groups, mandatory requirements and desirable features. We chose three generator models to compare based on the mandatory requirements. All the generators we considered in the report meet or exceed all of the mandatory requirements. We also considered the financial aspect in our comparison. We used a point based system to compare the generators. The generator model that would score the highest number of points, out of 100 points, will be recommended. I would like to give special thanks to nova"s operation team who worked closely with me during the research phase of this report. Also to nova"s technical team who allowed me to work in the server room. Also to hydro ottawa who assisted in determining nova"s power system. I hope this report meets your needs, and helps nova"s decision in purchasing a generator.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers