EC207 Study Guide - Midterm Guide: Histogram, Central Limit Theorem, Poisson Distribution

120 views2 pages
5 May 2017
School
Department
Course
Professor

Document Summary

Is the upper limit on the workload that an operating unit can handle. An operating unit might be a plant, department, machine, store, or worker. Strategic capacity planning is the systematic determination of facility and major machine/equipment requirements to meet long term demand for goods and services. The maximum output rate that can be sustained given work breaks, scheduling dif culties and expected delays, machine/equipment maintenance, etc. The ratio of actual output rate to effective capacity. The ratio of uptime(actual operating time) to available time. The design of facilties, including oor space and layout, directly in uence effective capacity. Layout of the work area often determines how smoothly work can be performed. When items are similar, the ability of the system to produce those items is much greater than when successive items differ. There is less need for product change-over and machine/equipment setup.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents