BUAD 341 Study Guide - Final Guide: Gurn, Stert, Asteroid Family

OC3138152 Page
29
Purpose- a onetime activity with well defined end results. Temporary-has a definite beginning and a definite end, hence a finite duration. Life cycle-p
View Document
UTKBUAD 341AllSpring

BUAD 341 Study Guide - Final Guide: Critical Path Method, Ugm-27 Polaris, Critical Chain Project Management

OC3138151 Page
46
A project is a temporary endeavor undertaken to create a unique product or service. Purpose: a one time activity with well-defined desired end results.
View Document
UTKBUAD 341AllWinter

BUAD 341 Study Guide - Final Guide: Walgreens, Continuous Production, Takt Time

OC3138184 Page
18
Allstate insurance, microsoft corp: retail layout: allocates shelf space and responds to customer behavior. Kroger"s supermarket, walgreen"s, bloomingd
View Document
UTKBUAD 341AllFall

BUAD 341 Study Guide - Final Guide: Longest Path Problem, Critical Path Method, Work Breakdown Structure

OC3138161 Page
39
Purpose-a onetime activity with well defined end results. Temporary-has a definite beginning and a definite end, hence a finite duration. Life cycle-pr
View Document
UTKBUAD 341AllFall

Final Review (cheat sheet help)

OC3138178 Page
23
View Document
UTKBUAD 341AllWinter

BUAD 341 Study Guide - Final Guide: Critical Path Method, Beta Distribution, Market Risk

OC3138185 Page
12
Two different models: the critical path method(cpm, the program evaluation and review technique(pert, the differences between cpm and pert have all but
View Document
UTKBUAD 341AllSpring

BUAD 341 Study Guide - Final Guide: Early Start, Gantt Chart, Work Breakdown Structure

OC3138155 Page
10
For projects, the key resource is employees" time. Hr is the most expensive and the most important people are the most valuable managers, consultants a
View Document
UTKBUAD 341AllWinter

BUAD 341 Study Guide - Final Guide: Decision-Making, Prentice Hall, Emv

OC3138183 Page
22
Alternative: a course of action or strategy that may be chosen by a decision maker (e. g. not carrying an umbrella tomorrow) State of nature: an occurr
View Document
UTKBUAD 341AllWinter

BUAD 341 Study Guide - Final Guide: Digital Negative, Work Breakdown Structure, Unita

OC3138172 Page
20
Project a series of related jobs usually directed toward some major output and requiring a significant period of time to perform. A temporary endeavor
View Document
UTKBUAD 341AllWinter

BUAD 341 Study Guide - Final Guide: Multiple Choice, A Aa, Early Start

OC3138156 Page
30
There is only one functional manager in the matrix project organizational. Duplication of resources is minimized with the matrix structure. A task is a
View Document
UTKBUAD 341AllSpring

BUAD 341 Study Guide - Midterm Guide: Arawn, Triage, Shap

OC3138183 Page
64
Mass service= high labor intensity/ low interaction. Mail contact- allows system to work efficiently yet low additional product sales. Internet b/c it
View Document
UTKBUAD 341AllSpring

BUAD 341 Study Guide - Midterm Guide: Job Satisfaction, Continual Improvement Process, Fixed Cost

OC3138177 Page
55
The exam will cover information from chapter 7 and chapter 12. This review is intended for students in ba 341 lean operations (bichescu) and covers imp
View Document