ACIS 2116 Midterm: Chapter 4 In-Class Problems Solutions
36 views8 pages
15 Feb 2020
School
Department
Course
Professor
Document Summary
In-class problem #1 (the following problem is not from this textbook) Precision manufacturing inc. (pmi) makes two types of industrial component parts the ex300 and the. It annually produces 62,000 units of ex300 and 12,700 units of tx500. The company"s traditional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the company"s two product lines is shown below: The company is considering implementing an activity-based costing system that distributes all of its manufacturing overhead to four activities as shown below: Compute the plantwide overhead rate that would be used in the company"s traditional cost system. (round your answer to 2 decimal places. ) Using the plantwide rate, compute the overhead that would be allocated to the two products. (overhead allocated and overhead applied have the same meaning) 1-c. compute the product cost per unit for each of the two products under the traditional system.
Get access
Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Related Documents
Related Questions
Hickory Company manufactures two products—15,000 units ofProduct Y and 7,000 units of Product Z. The company uses aplantwide overhead rate based on direct labor-hours. It isconsidering implementing an activity-based costing (ABC) systemthat allocates all of its manufacturing overhead to four costpools. The following additional information is available for thecompany as a whole and for Products Y and Z: (The totalestimated overhead cost may not agree with the sum of allocatedoverhead costs to each product.) |
Activity CostPool | ActivityMeasure | Estimated Overhead Cost | Expected Activity | ||
Machining | Machine-hours | $ | 227,700 | 11,000 | MHs |
Machine setups | Number of setups | $ | 153,900 | 270 | setups |
Productiondesign | Number of products | $ | 91,000 | 2 | products |
General factory | Direct labor-hours | $ | 257,000 | 10,000 | DLHs |
ActivityMeasure | Product Y | Product Z |
Machining | 7,700 | 3,300 |
Number ofsetups | 60 | 210 |
Number ofproducts | 1 | 1 |
Directlabor-hours | 8,700 | 1,300 |
Required: |
Using the ABC system, how muchtotal manufacturing overhead cost would be assigned to ProductY?(Round your intermediate calculations to 2 decimal placesand final answers to the nearest dollar amount.) |
Total manufacturingoverhead cost | $ |