AFM341 Chapter Notes - Chapter 7: Unique Key, Data Integrity, Swim Lane
Document Summary
Implement a relational database from the uml class diagram of the conversion process. Separate 3 areas for the swim lane: authorization, recording, custodial. Difference between revenue and conversion process: using inventory as a resource. 2nd phase: analysis, bpmn: event, activities, sequence flows. Can you have direct relationship between resources and agent: formally, no but because of type images, you can have direct relationships. Example: sunset graphics conversion process: when the quantity on hand of a product dropped below the minimum level, the item manager authorized production to increase the quantity on hand, ex. 7 activities: process flow loops until the batch is complete. Intermediate error event interrupts flow if inspection failed. Partner with proper authority authorizes production to ensure finished goods available to meet expected demand. System must provide authorization order number control, default values, range and limit checks, and create audit trail. Issues from raw material according to bill of material recorded accurately.