BU385 Chapter 5: Operations - Chapter 5

42 views6 pages
25 Mar 2016
School
Department
Course
Professor

Document Summary

Capacity the upper limit on the workload that an operaing unit can handle. Capacity is also measured as maximum producion rate. Strategic capacity planning systemaic determinaion of facility and major equipment requirements to meet long-term demand for goods and services. Design capacity the maximum output that can possibly be atained under ideal soluions. Efecive capacity the maximum possible output that can be sustained given operaing hours, product mix, scheduling diiculies and expected delays, and machine maintenance. Uilizaion = actual output _ or = used time _ Design capacity = 5 trucks per day (designed for 8 hours a day with 2 mechanics) Efecive capacity = 4 trucks per day (1-hour lunch break and 1 hour expected delay) Actual output = 3 trucks per day (1. 5 hours of addiional unexpected delays and break downs per day) Eiciency = 3 trucks per day = 75% Uilizaion = 3 trucks per day = 60%

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents