ENGR 100 Lecture Notes - Lecture 32: Sydney Harbour Bridge, Dorman Long, List Of Doctor Who Universe Creatures And Aliens
Document Summary
Chief engineer (jjc bradfield) coordinating all project activities. British design engineer (ralph freeman) and design team. Temporary township was built at the quarry in moruya. Stone masons where brought in by dorman long from italy and scotland workers suppling masonry for piers. Chief engineer bradfield and design engineer ennis oversaw all facets of the project. Gangers and team leaders supervised work crews. Bridge workers carried out all stages of manufacturing and assembly. Segments were fabricated at a local factory and transported to site. Riveting, painting, concrete pours and asphalt production was kept in house. 25% of the steel production was sourced locally with 75% coming from england. Stone masons where brought in by dorman long from italy and scotland to work in the make shift quarry. Steel manufacturer in england and australia (25% of steel was made in australia) Different types of bridges designed at a different locations.