CE 2700 Chapter : LOIS PAPER
Document Summary
The original lake oswego interceptor sewer construction in the 1960"s was designed by the city of lake oswego as a large sewer line that travels sewage straight to the treatment plain through pipes under the lake. The lake and the construction of the original lois system is owned and operated by the lake oswego corporation (loc), consisting of the 1,000 property shareholders, and any work outside of the existing conditions were required approval from loc. An online oswego news program was created to keep in touch with the citizens and project work team to present any involved with updates. Lois even makes the property value increase an average of 15%. The sewage is collected from main and trunk sewer pipes from the west of the city where all the sewage from the city is accumulated and transports it to the east of the lake.