MGMT 4410 Lecture Notes - Lecture 8: Gas Meter, Tape Measure, Semicircle

31 views4 pages

Document Summary

Development phase: inputs, determine factors that facilitate learning and transfer, choice of instructional methods, process, instructional strategy, training plan, outputs, training plan, instructional material, trainer and trainee manuals, instructional equipment, trainer, facilities, list of items and actions needed. Target population: apprentices who have successfully passed the gas fitter exam. Overall training objective: trainees will be able to examine a work project and with appropriate tools: measure, cut, install and thread the piping according to standards outlined in the gas code. Learning objective: using a tape measure, determine the number and length of pipes necessary to connect the furnace to the gas meter in a manner that meets the gas code. Account for the extra length needed due to threading 2. Take into account length is reduced by different fittings 3. Material and av: trainee manual, overhead, move meter and furnace setup, tape measure, note pads, assortment of one inch and three-quarter inch fittings, elbows, street elbows, and unions.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents