EECS 1520 Lecture 2: EECS 1520 Lecture 2 Notes

17 views2 pages
EECS 1520 Lecture 2 Notes
Introduction
Austin anticipation
Exhibit 1.4 summarized how an MNCs expected cash flows and valuation are subject to
uncertainty through exposure to international conditions.
Up to this point, the possible impact of each international condition on an MNCs cash
flows has been treated in isolation.
In reality, however, an MNC must consider the impact of all international conditions so
that it can determine the resulting effect on its cash flows.
EXAMPLE
Recall the original example of Austin Co., a U.S.-based MNC that expects to generate
$40 million annually in cash flows from its operations in the United States and 20 million
euros annually in cash flows from its operations in Europe over the next three years.
Assume that Austin anticipates a possible European recession during this period and
therefore revises its expectations as follows to reflect that possibility.
The company expects that a European recession will adversely affect the U.S. economy
and result in reduced U.S. demand for its computer games
it therefore reduces its estimated dollar cash flows from U.S. operations to $38 million
annually over the next three years.
Austin expects that a European recession will result in a reduced European demand for
its computer games, so it lowers its estimated euro cash flows from European
operations to 16 million euros annually over the next three years.
The firm expects that a European recession will weaken the euro and hence lowers its
estimate of the euros value to $1.20 over the next three years.
Altogether, then, Austins expected annual cash flows for each of the next three years
are now calculated as follows.
Austins total expected $ cash flows each year ¼ $ cash flows from U:S: operations þ $
cash flows from foreign operations ¼ $ cash flows from U:S: operations þ ½ðeuro cash
Unlock document

This preview shows half of the first page of the document.
Unlock all 2 pages and 3 million more documents.

Already have an account? Log in
mahika.c06 and 40040 others unlocked
EECS 1520 Full Course Notes
54
EECS 1520 Full Course Notes
Verified Note
54 documents

Get access

Grade+
$40 USD/m
Billed monthly
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
10 Verified Answers
Class+
$30 USD/m
Billed monthly
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
7 Verified Answers

Related Documents