CHM1045 Lecture Notes - Lecture 6: Bunsen Burner, Wire Gauze, Kimberly-Clark

226 views1 pages

Document Summary

Procedure: obtain a gas measuring tube and stopper assembly. Clean tube thoroughly with soap solution, rinse with tap water and then distilled water: fill 500-600 ml beaker with 2-3 inches of water, obtain 3 samples of same metal (be sure to handle with kimwipes). Set up tripod (or ring stand and ring) with wire gauze and bunsen burner + start heating the water: weigh the sample of the metal in a small beaker on the electronic balance. Record the mass of beaker + sample and the mass of the empty beaker. For mg sample mass < 0. 080 g: the stopper up for the gas measuring two has a piece of copper wire on it. Wrap this wire around metal sample several times so securely attached to the stopper: clamp gas tube to ring stand with closed end toward the floor and open end towards the ceiling.

Get access

Grade+
$40 USD/m
Billed monthly
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
10 Verified Answers
Class+
$30 USD/m
Billed monthly
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
7 Verified Answers

Related Documents

Related Questions