OM 374 Lecture Notes - Lecture 16: Mixed Model

23 views2 pages
Balance delay
the amount by which efficiency falls short of 100%
Bottleneck
capacity constraint resource (CCR) whose available capacity limits the organization's ability to meet the
product volume, product mix, or demand fluctuation required by the marketplace
Constraint
any factor that limits the performance of a system and restricts its output, in linear programming, a
limitation that restricts the permissible choices for the decision variables
Cycle time
maximum time allowed for work on a unit at each station
Drum-buffer-rope (DBR)
a planning and control system that regulates the flow of work=in=process materials at the bottleneck or
the capacity constrained resource (CCR) in a productive system
Immediate predecessors
work elements that must be done before the next element can begin
Line balancing
assignment of work to stations in a line process to achieve the desired output rate with the smallest
number of workstations
Mixed model line
production line that produces a mix of models in smaller lots
Pacing
movement of product from 1 station the next as soon as the cycle time has elapsed
Precedence diagram
find more resources at oneclass.com
find more resources at oneclass.com
Unlock document

This preview shows half of the first page of the document.
Unlock all 2 pages and 3 million more documents.

Already have an account? Log in

Document Summary

Balance delay the amount by which efficiency falls short of 100% Bottleneck capacity constraint resource (ccr) whose available capacity limits the organization"s ability to meet the product volume, product mix, or demand fluctuation required by the marketplace. Constraint any factor that limits the performance of a system and restricts its output, in linear programming, a limitation that restricts the permissible choices for the decision variables. Cycle time maximum time allowed for work on a unit at each station. Drum-buffer-rope (dbr) a planning and control system that regulates the flow of work=in=process materials at the bottleneck or the capacity constrained resource (ccr) in a productive system. Immediate predecessors work elements that must be done before the next element can begin. Line balancing assignment of work to stations in a line process to achieve the desired output rate with the smallest number of workstations. Mixed model line production line that produces a mix of models in smaller lots.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents