I need to Prepare entries for a job order, cost system, and cost of goods manufactured schedule, but my numbers aren't matching up. Please answer both parts of the question.
Case Inc. is a construction company specializing in custom patios. The patios are constructed of concrete, brick, fiberglass, and lumber, depending upon customer preference. On June 1, 2017, the general ledger for Case Inc. contains the following data.
P15-3A Prepare entries for a job order cost system and cost of goods manufactured schedule Case Inc. is a construction company specializing in custom patios. The patios are constructed of concrete, brick, fiberglass, and lumber, depending upon customer preference. On June 1, 2017, the general ledger for Case Inc. contains the following data. Raw Materials Inventory $4,200 Manufacturing Overhead Applied $32,640 Work in Process Inventory $5,540 Manufacturing Overhead Incurred $31,650 Subsidiary data for Work in Process Inventory on June 1 are as follows. Job Cost Sheets Customer Job Cost Element Rodgers Stevens Linton Direct materials $600 $800 $900 Direct labor 320 540 580 Manufacturing overhead 400 675 725 $1,320 $2,015 $2,205 During June, raw materials purchased on account were $4,900, and all wages were paid. Additional overhead costs consisted of depreciation on equipment $900 and miscellaneous costs of $400 incurred on account. A summary of materials requisition slips and time tickets for June show the following. Customer Job Materials Requisition slips Time tickets Rodgers $ 800 $850 Koss 2,000 800 Stevens 500 360 Linton 1,300 1,200 Rodgers 300 390 4,900 3,600 General use 1,500 1,200 $ 6,400 $4,800 Overhead was charged to jobs at the same rate of $1.25 per dollar of direct labor cost. The patios for customers Rodgers, Stevens, and Linton were completed during June and sold for a total of $18,900. Each customer paid in full. Instructions (a) Journalize the June transactions: (1) for purchase of raw materials, factory labor costs incurred, and manufacturing overhead costs incurred; (2) assignment of direct materials, labor, and overhead to production; and (3) completion of jobs and sale of goods. (b) Post the entries to Work in Process Inventory. (c ) Reconcile the balance in Work in Process Inventory with the costs of unfinished jobs. (d) Prepare a cost of goods manufactured schedule for June. NOTE: Enter a number in cells requesting a value; enter either a number or a formula in cells with a "?" . (a)(1) Journalize the June transactions for purchase of raw materials, factory labor costs incurred, and manufacturing overhead costs incurred Raw Malerials Inventory Accounts Payable Factory Labor Cash Manufacturing Overhead Accumulated Depreciation- Equipment Accounts Payable (a)(2) Journalize the June transactions for assignment of direct materials, labor, and overhead to production Work in Pricess Inventory Manufacturing Overhead Raw Malerials Inventory Work in Pricess Inventory Manufacturing Overhead Factory Labor Work in Pricess Inventory Manufacturing Overhead (a)(3) Journalize the June transactions for completion of jobs and sale of goods. Finished Goods Inventory Work in Process Inventory Cash Sales Cost of Goods Sold Finished Goods Inventory (b) Post the entries to Work in Process Inventory. Work in Process Inventory 6/1 Balance June Completed work Direct Materials Direct labor Overhead applied 6/30 Balance (c ) Reconcile the balance in Work in Process Inventory with the costs of unfinished jobs. 6/30 balance in Work in Process Inventory Unfinished Job (Koss) Direct materials Direct labor Manufacturing overhead (d) Prepare a cost of goods manufactured schedule for June. CASE INC. Cost of Goods Manufactured Schedule For the Month Ended June 30, 2017 Work in process, June 1 Direct materials used Direct labor Manufacturing overhead applied Total manufacturing costs Total cost of work in process Less: Work in process, June 30 Cost of goods manufactured After you have completed P15-3A, consider the following additional question. 1. Assume that indirect labor and raw materials purchases changed to $1,400 and $6,800 respectively. Also assume that overhead is applied at the rate of $1.50 per dollar of direct labor. The three completed jobs were sold for $22,000 cash. Revise the journal entries to reflect these changes.
I need to Prepare entries for a job order, cost system, and cost of goods manufactured schedule, but my numbers aren't matching up. Please answer both parts of the question.
Case Inc. is a construction company specializing in custom patios. The patios are constructed of concrete, brick, fiberglass, and lumber, depending upon customer preference. On June 1, 2017, the general ledger for Case Inc. contains the following data.
|