1
answer
0
watching
536
views

At the end of June, the job cost sheets of Racing Wheels, Inc.,shows the following total costs accumulated on three customjobs:

Job 102 Job 103 Job 104
Direct Materials $15,000 $33,000 $27,000
Direct Labor 8,000 14,200 21,000
Overhead 4,000 7,100 10,500

Job 102 began production in May, and the following costs wereassigned to it in May: direct materials $6,000; direct labor$1,800; and overhead $900. Jobs 103 and 104 began in June. Oneapplies overhead cost with a predetermined rate based on directlabor cost. Jobs 102 and 103 are finished in June, and Job 104 isexpected to be finished in July. No raw materials are usedindirectly in June. Using this information, answer the followingquestions:

What is the cost of the raw materials requisitioned in June foreach of the three jobs?

How much direct labor cost is incurred during June for each ofthe three jobs?

What predetermined overhead rate is used during June?

How much total cost is transferred to finished goods duringJune?

For unlimited access to Homework Help, a Homework+ subscription is required.

Hubert Koch
Hubert KochLv2
28 Sep 2019

Unlock all answers

Get 1 free homework help answer.
Already have an account? Log in

Related questions

Weekly leaderboard

Start filling in the gaps now
Log in