1
answer
0
watching
219
views
6 Oct 2020
Construct the cost schedule using the data below for a firm operating in the short run.
Total Output (Q)
Total Fixed Cost (TFC)
Total Variable cost (TVC)
Total Cost (TC)
Marginal Cost (MC)
Average Fixed cost (AFC)
Average Variable Cost (AVC)
Average Total Cost (ATC)
0
$50
1
$70
2
$85
3
$95
4
$100
5
$110
6
$130
7
$165
8
$215
9
$275
Construct the cost schedule using the data below for a firm operating in the short run.
Total Output (Q) | Total Fixed Cost (TFC) | Total Variable cost (TVC) | Total Cost (TC) | Marginal Cost (MC) | Average Fixed cost (AFC) | Average Variable Cost (AVC) | Average Total Cost (ATC) |
0 | $50 | ||||||
1 | $70 | ||||||
2 | $85 | ||||||
3 | $95 | ||||||
4 | $100 | ||||||
5 | $110 | ||||||
6 | $130 | ||||||
7 | $165 | ||||||
8 | $215 | ||||||
9 | $275 |
Divya SinghLv10
5 Apr 2021