1
answer
0
watching
616
views
28 Sep 2019
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars) Years from Now After-Tax CF 0 -26 1â9 16 10 26 The project's beta is 3.8. Assume rf = 10% and E (rM ) = 17%. Required: (a) What is the net present value of the project? (Enter your answer in millions. Round your answer to 2 decimal places.) Net present value million (b) What is the highest possible beta estimate for the project before its NPV becomes negative? (Round your answer to 3 decimal places.) Highest possible beta estimate
You are a consultant to a large manufacturing corporation considering a project with the following net after-tax cash flows (in millions of dollars) Years from Now After-Tax CF 0 -26 1â9 16 10 26 The project's beta is 3.8. Assume rf = 10% and E (rM ) = 17%. Required: (a) What is the net present value of the project? (Enter your answer in millions. Round your answer to 2 decimal places.) Net present value million (b) What is the highest possible beta estimate for the project before its NPV becomes negative? (Round your answer to 3 decimal places.) Highest possible beta estimate
Elin HesselLv2
28 Sep 2019