LA 3302 Final: Exercise 5 Clearing And Tree Preservation Plan Requirements

18 views3 pages
15 Mar 2019
School
Course
Professor

Document Summary

Landscape technology 2- structures and design detailing spring 2011. Site preparation plans are used to control construction on a job site and to protect any significant site resources including trees, steep slopes, wetlands, natural habitat , productive soils and wildlife. This plan will also show the contractor where to clear, where to store topsoil and building materials. In addition, near the shack an electric pole will be installed, a visitor parking area graded and a place for dumpster disposal. The plan will help preserve trees and protect habitat and allow for orderly development of the site. The plan will be used by the contractor, sub-contractors, the surveyor and grading contractors. Include list of trees to be removed from the site. List them by species, and dbh (diameter at breast height 41/2") and show total dbh removed. Determine the net dbh removed to clear the site. The net dbh removed will have to be included on the planting plan.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents