BAMG 30700 Study Guide - Final Guide: Continual Improvement Process, Overproduction, Workflow

36 views2 pages
Process Analytics Final Study Guide
Lecture Notes:
What are Lean Systems?
o Lean System:
operational systems that maximize the value added by each of a
opay’s atiities y eoig aste ad delays fo the
o Just-In-Time Philosophy:
the belief that waste can be eliminated by cutting unnecessary capacity
or inventory and removing non-value-added activities in operations
Continuous improvement using a lean systems approach
Think about the home Depot article
Eight Types of Waste (7 Deadly Sins + 1):
o 1. Overproduction:
making more parts than you can sell
o 2. Delay:
waiting for processing, parts sitting in storage, etc.
o 3. Transporting:
moving parts to various storage locations, from process to process, etc.
happens a lot in auto industry
o 4. Inventory:
committing money and storage space to parts not sold
find more resources at oneclass.com
find more resources at oneclass.com
Unlock document

This preview shows half of the first page of the document.
Unlock all 2 pages and 3 million more documents.

Already have an account? Log in

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents