Process Analytics Final Study Guide
VSM Metrics:
o 1. Cycle Time (C/T):
the time it takes to complete a given operation or process
o 2. Setup Time or Change Over Time (C/O):
the time that it takes to change a tooling, prepare a production line, cell
or a production unit for a new run
how long to get a particular cell to do a production run
o 3. Availability:
the available working time in one shift minus programmed brakes such as
lunch time and resting breaks, given in seconds
o 4. Uptime %:
(availability C/O) / (availability)
converted to seconds
o 5. Capacity:
availability / time at bottleneck
how many things can that cell do during cycle time?
o 6. Takt Time:
daily availability / daily demand
o 7. Per Unit Processing Time:
cycle time + setup time
find more resources at oneclass.com
find more resources at oneclass.com
Unlock document

This preview shows page 1 of the document.
Unlock all 3 pages and 3 million more documents.

Already have an account? Log in