Process Analytics Final Study Guide
Developing the Schedule:
o Earliest Start Time (ES):
the earliest start time of the immediately preceding activity
o Earliest Finish Time (EF):
a activity’s earliest start tie ES) plus its estimated during (t)
EF = ES + t
o Latest Start Time (LS):
the latest finish time of the immediately preceding activity
o Latest Finish Time (LF):
a activity’s attest start tie LS plus its estiated duratio t
LF = LS + t
o Activity Slack:
the maximum length of time that an activity can be delayed without
delaying the entire project
S = LS ES or S = LF EF
If slack = 0, then LS and ES are equal or LF and EF are equal
indicates that on critical path
Why is it important to have an estimate of slack?
In case something goes wrong, need contingency
May want to use contractors in this area
find more resources at oneclass.com
find more resources at oneclass.com
Unlock document

This preview shows page 1 of the document.
Unlock all 3 pages and 3 million more documents.

Already have an account? Log in