B A 360 Lecture Notes - Lecture 23: Statistical Process Control, Korban, Human Factors And Ergonomics

24 views1 pages
7 May 2020
School
Course
Professor

Document Summary

" expose i provide fail-safe methods poor quality with small immediate feedback lot jit technology mechanism to reduce waste and improve automation using mechanism that are linked rollers springs , magnets , gears, Lean - focuses all on speed process waste and. Waste - everything from the time between activities , customers" anything reducing. Reduced lot sizes i del situatuation is to have lot sites of one. , pulled from one process to the next. Eoq can be used to calculate often makes it not the desired feasible setup time. " improvement opportunities in lot size reduction : time. " communicate level schedules freeze perform to schedule. Kanbans each operation produce a perfect part card the next container of material to be produced. Many different pulls material through the process of signals are used. , but the system is still called a korban. Need to know the lead time cards or containers required to produce a container of parts.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents