ADM 2341 Study Guide - Final Guide: Material Requirements Planning, Carrying Cost, P200

50 views14 pages

Document Summary

Material require m e n t s plannin g. The product structure tree of product a is given below. The lead times and available inventories of each item are found in the following table. Show your work. (hint: you do not need to develop an mrp plan; also, do not specify when the units of e must be ordered: we only want the total number of e to order). We need 2000 units of a but we have 200 in inventory, so the net requirement for a is 1800 units. For every 1a we need 1e, so our gross requirement for e is 1800. We have 900 units in inventory, so our net requirement for e is 1800-900=900 units. Show your work. (hint: you do not need to develop an mrp plan; also, do not specify when the units of c must be ordered: we only want the total number of c to order).

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents

Related Questions