Management and Organizational Studies 4312A/B Study Guide - Midterm Guide: Discounting, Net Present Value, Spot Contract

125 views2 pages

Document Summary

A) the fixed interest rate which makes the swap a zero-npv deal is 6. 12%, b) Npv= pv of amount to be received - pv of payments=0. Let single amount to be received be x. Pv of amount to be received = pv of payments. Single amount to be received each year x total discount factor = floating rate payments*discount factor. The standard deviation of the first difference check is 8813. 84. 6. 95: mean of our distribution of npv0s is 6538. 552436, and standard deviation is. 13392. 04969: by using normal method, the var of this swap is 10788. 61152, and the expected. Raroc is 0. 606 = 60. 6: a) the standard error is 1345. 951637, and the confidence interval is [3900. 487228, 9176. 617643: the simulation depicts that the swap contract gives us a positive npv, even though the number is relative small, compared to our initial investment million. However, 100 random samples may not provide sufficient data to predict the future spot rate.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers

Related Documents