GCM 372 Lecture Notes - Lecture 4: Cost Estimate, Absenteeism, Iso 9000

58 views5 pages

Document Summary

Standard too low and we lose money. Standard too high and we don"t get the jobs. So our costs are consistent and not erratic. Inconsistent and erratic standards and we might as well just pull numbers out of the air. We can expect to lose loyalty of customers over time. Allows us to determine the speed to complete an operation. Is based on the amount of time required to perform a manufacturing operation. Is based on the amount of material required to perform an operation. Allows us to schedule jobs, employees, equipment and cost centres accurately. Time required for makeready activities on a piece of equipment usually expressed as time or units of activity. Speed at which the machine can run usually expressed as completed pieces per time (could be length to be completed over time). Materials required to perform a given task usually expressed as a variable volume (ink) or fixed quantity (plates) per task.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents