Business Administration 1220E Lecture Notes - Lecture 4: Control Chart, Sample Size Determination, Type I And Type Ii Errors

110 views4 pages
hwpark22 and 40161 others unlocked
Business Administration 1220E Full Course Notes
40
Business Administration 1220E Full Course Notes
Verified Note
40 documents

Document Summary

Otherwise, reject all items in the lot: historical mentality: (cid:498)some degree of poor quality will occur and that is acceptable(cid:499) General steps in spc: define the quality characteristic to measure, attributes: characteristics that are measured qualitatively, thus have discrete values, e. g. Defective/non-defective, # of scratches or blemishes: count both defective and non-defective items--> p-chart, count defective features in an item--> c-chart, variables: characteristics that are measure quantitatively, thus have continuous values, e. g. Weight, length, volume, temperature: difference (range) between smallest and largest values--> b- chart, average--> e-chart, set up a control chart, chart pg. 88, take a random sample and plot the quality measure, chart pg. Stop the process until the quality problem is identified and fix: process improvement tools, discard out-of-control sample observations, may need to revise the control chart. P-chart: control chart for attributes: quality to be measured: proportion of defective items, sample size (n): 30-100 items per sample (guideline, center line: = historical average proportion of defects.

Get access

Grade+20% off
$8 USD/m$10 USD/m
Billed $96 USD annually
Grade+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
40 Verified Answers
Class+
$8 USD/m
Billed $96 USD annually
Class+
Homework Help
Study Guides
Textbook Solutions
Class Notes
Textbook Notes
Booster Class
30 Verified Answers

Related Documents